OLT’s Terminal is working at full capacity

Mediagallery

Livorno, 10 September 2019 – OLT Offshore LNG Toscana’s Terminal will work at 100% of its capacity: 41 slots on 41 available for the Gas Year 2019/2020 have been allocated, for a total of about 6,3 millions of cubic meters of capacity. This important result consolidates the operative outcomes reached in the last Gas Year. Moreover, these data confirm the effectiveness of the new allocation capacity mechanism via auctions introduced in 2018, which makes the regasification sector more flexible and in line with the market demand, both for the spot market and the long and middle term ones, as demonstrated by the results achieved this year.